Quick summary
|
Cases picked per hour is a common way to measure warehouse productivity, the rate moves whenever the work changes. After a re-slot spreads fast movers across more aisles, pickers walk farther for every case, and the hourly rate drops even if nobody slowed down. From the rate alone, a manager can’t tell whether people worked slower or the work got harder.
When managers use the same productivity rates to plan shifts, they may underestimate how many labor hours varied workloads require. Overtime or temporary staff then make up the shortfall. Those extra hours add up. Payroll and temporary staffing accounted for about $45 of every $100 in expenses at U.S. warehousing and storage companies in 2022.
A labor management system (LMS) separates slower work from harder work by comparing each task with how long it should take. But implementing one doesn’t necessarily guarantee better results.
What is a labor management system?
A labor management system (LMS) is warehouse software that compares how long each task took with its expected time. Supervisors see the results for each associate and activity on every shift and can spot where work runs long.
An LMS program needs three things working together to produce numbers supervisors can trust:
- Warehouse task data: Records from your warehouse management system (WMS) for each pick, putaway, replenishment, and load. Each record shows who performed the work, where it happened, the quantity handled, and the timing.
- Labor standards: A standard sets how long each task should take, including travel, handling, and allowances for rest and unavoidable delays.
- A management routine: Supervisors review gaps between expected and recorded time during and after each shift to decide whether associates need coaching, retraining, or a process change.
Those three parts matter whether the software is a standalone LMS or a labor module inside your WMS. If your WMS package already includes one, you may not need separate LMS software. However, you still need to budget to configure it around your warehouse’s work, train supervisors, and make performance reviews part of their shifts.
How does a labor management system work?
An LMS works from two inputs for every task. Labor standards set the expected times, and your WMS logs when each task starts and ends. Supervisors review how the two line up during or after the shift, and the next shift’s numbers show whether a coaching session or a new pick path worked.
Each step below explains how you build and use that information.
Establish expected performance with labor standards
Start by defining the work each standard covers, including the method and equipment used. For example, replenishment might involve moving a full pallet with a forklift or carrying cases from reserve storage to a shelf. Since those activities take different amounts of time, a general “replenishment” target gives the LMS too little information to assess them fairly.
Set the expected times for those defined activities based on a trained associate following the agreed method at a normal working pace. Then configure the standards in the LMS and link them to the relevant activities. When task records arrive from the WMS, the LMS applies the standard that matches the work performed.
Capture warehouse tasks and labor time
The WMS timestamps each task it directs as associates start and confirm work. The LMS reads those timestamps to determine what was completed and how long it took. Those figures depend on associates following the recording process and the systems capturing the time against the correct activity.
However, not all paid time goes to tasks. Meetings, cleaning, and training take up part of the shift too. Your associates log these as indirect activities, so the LMS records how long they spend on them.
Together, the task records and indirect activity entries explain how these associates spent their time. To check whether they cover the full paid shift, the LMS uses clock-in and clock-out times from the time and attendance system and excludes unpaid breaks. It compares paid hours with the total hours recorded for tasks, indirect activities, and paid breaks. Any difference due to someone forgetting to log something like a meeting or time spent waiting for equipment needs checking.
Calculate earned hours and productivity
Earned hours are the total time the labor standards allow for the tasks an associate finished.
For example, the standards allow four hours for a set of picks, but the associate takes five hours to finish them. The report shows four earned hours and five actual hours. Performance is four divided by five, multiplied by 100, or 80% of standard. Finishing in the expected four hours would give 100%.
That calculation covers time spent completing tasks. To see how much of the paid shift went to tasks, the LMS calculates labor utilization: task hours divided by total paid hours, multiplied by 100.
Your associate might meet the picking target whenever stock is available but spend an hour waiting for replenishment. If that hour is recorded separately as waiting, picking performance stays at target while utilization falls. These warehouse KPIs help supervisors see both how efficiently tasks were completed and how much paid time they spent waiting.
Provide feedback for supervisors and associates
When results come in below standard, a supervisors first question is whether the problem belongs to one associate or to everyone doing that task. If one teammate consistently falls behind on a task the rest of the team performs well, coaching or retraining on the method is likely the answer. When several associates struggle with the same activity, the cause is more likely shared. Equipment problems or a changed layout may be slowing the work, or the standard itself may no longer match it.
Associates see their own results too, on a handheld device, a display near the work area, or a report. They need to understand the target and see which completed tasks were counted, the time allowed, and the time recorded. With that detail, they can flag missing work or explain a delay, and the supervisor’s review covers what happened on the floor as well as what the report says.
What a labor management system improves in warehouse operations
A LMS improves warehouse operations by showing how much labor each task should take and where the rest of the paid shift goes. What that saves depends on how you use the freed-up time. For example, putting it toward more orders adds capacity, while reducing overtime or temporary staffing cuts spending.
The gains below show up in numbers you can check before and after go-live.
Lower labor cost per unit and higher throughput
Labor cost per unit is total labor cost divided by units shipped. It falls when the same people complete more work in the same hours, and an LMS shows supervisors where to move associates during the shift to make that happen.
For example, a packing team struggling to clear orders before the shipping cutoff might need support from cross-trained associates whose picking work is complete. The WMS shows the remaining workload, while the labor standards show how many hours that packing work will take. Moving the right number of pickers to packing lets the warehouse ship more orders on time.
Task records also help you find opportunities to reduce time. For example, repeated handling or long travel routes add time to every affected order. Removing an unnecessary handling step or shortening a route saves that time each time the task is performed, and it lets the team fit more work within the shift.
To turn that extra work into higher throughput, check whether packing and shipping can handle the additional volume. If they’re already at full capacity, they become the next constraint to fix.
Accurate staffing against forecasted workloads
Labor standards help you convert a volume forecast into the hours needed to complete it. For picking, the number of order lines often matters more than the number of units, because each line means another stop at a pick location.
Suppose tomorrow’s forecast is 30,000 units. For illustration, assume the standard allows one minute per order line for travel and positioning, plus six seconds to handle each unit. If orders average six units per line, the work involves 5,000 lines. Travel and positioning then take 5,000 minutes, and handling takes another 3,000 minutes, for about 133 labor hours. With seven productive hours available per associate, you need 20 pickers.
If the average falls to two units per line, the same 30,000 units now require 15,000 lines. Handling time stays at 3,000 minutes, but travel and positioning rise to 15,000 minutes. Picking now requires 300 labor hours, or 43 pickers at seven productive hours each.
A plan built on the first order profile would staff 20 pickers for a day that needs 43. Running the same calculation for receiving, putaway, packing, and loading gives you staffing by activity. You can then book overtime or temporary labor before the work arrives, whether that’s tomorrow’s shift or peak season.
Better visibility into direct and indirect labor time
Direct labor is time spent on measured tasks, and task records capture it automatically. Indirect labor includes other paid time, and it usually shows up only when associates log it.
Choosing to record or ignore indirect time changes how you read performance. Without it, an associate who spent 40 minutes in safety training looks 40 minutes slow on picking. When associates log that time separately, supervisors can see whether delays come from the work itself or from conditions outside the associate’s control.
For example, when pickers keep logging “waiting for replenishment,” they are pointing to a stock-availability problem they can’t fix themselves. Review the affected locations to see whether refills are triggered too late or the pick faces hold too little stock for demand. The recorded hours show what problem costs, and you can rank the location by how much waiting each one causes.
Fairer productivity goals and employee performance management
A productivity goal is fair when it reflects the work an associate was assigned. Picking heavy, bulky items takes longer than picking small, light ones. With one hourly target for everyone, associates handling heavier items may fall behind even when they follow the correct method. With labor standards that allow time for the extra handling, a harder assignment no longer reads as poor performance.
Associates need to know what those targets require and what happens if they miss them. Some states require covered warehouse employers to put quotas in writing:
State | Key requirements |
Employers must give each worker a written description of every quota and what can happen if they miss it. Quotas can’t prevent meal or rest breaks. | |
Written description of each quota at hire, and written notice within two business days when a quota changes. | |
Written description of each quota, including any bonus or incentive tied to meeting it. |
With the target in writing and each task’s credit on the report, performance reviews can focus on method and training. This way, an LMS becomes a coaching tool that supports engagement and retention. If it’s used only to rank and discipline people, associates will distrust it.
Clearer labor costs by process and client
Labor hours and pay rates, divided by the volume handled, show the per-unit cost of all warehouse tasks like receiving, putaway, and picking. You use that breakdown to investigate expensive processes and estimate the savings from changing a method or adding automation.
A third-party logistics (3PL) provider runs several clients, each with its own contract and fees. They may share the same warehouse and employees, but each account requires different labor. A client with fewer orders may still take more time because its products need kitting or relabeling. Tracking costs by client reveals whether individual accounts cover their labor costs, even when the warehouse is profitable overall.
To get that breakdown, WMS task records need to identify the client each task belongs to. Any client-specific work associates log by hand goes under that client’s account as well. Compare each account’s labor cost with its fees before renewing the contract, and use the time recorded for value-added services to set rates that cover the work.
A baseline for improvement projects and incentives
An LMS shows whether a process change saved the expected labor. Before a re-slot, record current hours per unit. Recalculate standard task times for the proposed travel distances to estimate the savings. After the change, compare hours per unit for similar orders with the baseline. Finance uses that measured change to check whether the savings promised in the project proposal were achieved.
The same standards set the target when you offer bonuses for completing work faster than expected. Each associate should be able to see how much time their tasks allow and how their bonus is calculated. Write down those rules and apply them consistently. The allowed time must reflect the assignment’s difficulty, or people given easier work will have an unfair advantage in earning the bonus.
When budgeting for those bonuses, include their effect on overtime pay. Under federal rules, a promised production bonus raises a worker’s regular hourly rate. If they work overtime during a bonus week, you must legally pay them a higher overtime rate than usual.
Why labor standards matter more than a productivity score
Labor standards matter more than a productivity score because units per hour treats every unit as the same amount of work. A labor standard sets each task’s expected time from details such as travel distance and units per stop. Without one, the associate with the biggest pick count can rank first and still be behind pace.
The factors used to set the target are called variables. Single-variable and multiple-variable describe whether the standard uses one factor or several:
- Single-variable standards set one output target, such as 150 units an hour, and are simple to set and explain. They suit work where travel and handling stay consistent, such as repeated pallet moves over similar distances using the same equipment.
- Multiple-variable standards calculate expected task time from details such as travel distance, stops, units per stop, and weight. These engineered labor standards require more setup and accurate WMS data. Once configured, they adjust expected times as the recorded task details change.
For example, two pickers might finish an hour with the following results. The standard times and scores are illustrative:
Work assigned | Units picked in one hour | Standard time for that completed work | Performance |
Nearby locations, six units per stop. | 120 | 55 minutes | 92% |
Locations spread across the building, one unit per stop. | 70 | 63 minutes | 105% |
One unit per hour; the first looks about 70% more productive. Against the labor standards, the second picker comes out ahead. More stops and longer walks added up to 63 minutes of work, finished in 60. The first picker took 60 minutes to complete work expected to take 55.
Picking with this much variation needs a multiple-variable standard. Repeated pallet moves can stay on a single-variable one. Review either type when layout, equipment, or working methods change.
LMS vs. WMS vs. workforce management: What does each system do?
A WMS tracks inventory and directs the work, while an LMS checks that work against labor standards. Both deal with tasks as they happen, whereas workforce management (WFM) plans staffing and schedules. These functions may sit in separate systems or share one product.
Comparing their roles helps you see what your existing software covers before deciding whether you need another module or system.
System | Primary role | What it helps answer |
Warehouse management system (WMS) | Tracks inventory and directs warehouse tasks. | What work needs to be completed and where? |
Labor management system (LMS) | Compares task time with the time allowed by labor standards. | Did the work take longer or less time than expected? |
Workforce management (WFM) | Forecasts staffing needs and builds employee schedules. | How many people are needed, with which skills, and when? |
Time and attendance (T&A) | Records clock-in and clock-out times, breaks, and absences. | Who worked, and for how long? |
These systems share information to support different roles. For performance reporting, the LMS receives task records from the WMS and paid hours from time and attendance. The same labor standards used to assess completed work estimate how many hours a forecasted workload will require. Workforce management draws on WMS and labor data, including that estimate, to build schedules.
Vendors package these functions differently, but they overlap. Labor management may be a module within a WMS, and workforce management suites may include time and attendance. Some labor management products also handle scheduling. When comparing products, check which functions are included, which require another module, and how task and attendance records pass between them.
Why labor management systems lose effectiveness over time
An LMS drifts out of date after go-live because the warehouse keeps changing while its labor standards and task data fall behind. The LMS also depends on supervisors acting on its results, and that habit can fade once the launch is over.
In practice, that drifts shows up as three problems:
- Outdated labor standards: New equipment, packaging, or automation change task times, and a re-slot changes the travel distances the standards are based on. Standards that aren’t reviewed afterward may allow too much or too little time for the work. When a whole crew consistently scores well above standard, check whether the target now allows more time than the tasks require.
- Poor WMS data quality: Wrong location coordinates or missing item weights and dimensions distort expected-time calculations. Confirming tasks together at the end of a run obscures when each was completed. Unrecorded indirect time leaves gaps in the shift or gets counted against tasks, making them appear slower.
- Inconsistent supervisor adoption: When supervisors stop reviewing results with associates, delays go unexplained, and training needs get overlooked. If they use low scores only to justify discipline, they risk blaming associates for problems such as missing task records or equipment delays without checking what happened.
Each problem weakens a different part of the LMS, but the warning sign on the floor is the same: the numbers no longer match the work supervisors and associates see. Once they stop trusting those numbers, coaching based on them stops too. If your program has reached that point, see how to bring an underused labor management system back into daily use.
How to implement a labor management system
Roll out the LMS in phases so you can correct gaps in data or training before they affect performance reviews or pay. A crawl, walk, run approach gives supervisors and associates time to build confidence in the records before targets carry consequences.
- Crawl: Treat the launch as a learning period, with no performance targets. Supervisors check reports against what happened during the shift, while associates learn the recording routines and flag missing or wrongly recorded work.
- Walk: Introduce units-per-hour targets built on one to three variables, such as item type or zone. Establish regular coaching and recognition around those results, and review performance across several shifts to understand where the targets hold up and where assignment differences make them less useful.
- Run: Move to fully engineered standards once the records are reliable and the team knows how to interpret the results. Add incentives last, after associates have seen how the standards credit their work.
Before go-live, decide who will maintain the labor standards as the warehouse changes. An in-house industrial engineer or external team should review them when new equipment, layouts, or work methods affect task times. Otherwise, the LMS may continue measuring performance against standards that no longer reflect the work.
You also need to keep the software maintainable. Configure labor rules and standards through the system’s supported settings when possible, since custom code changes can require extra work at every upgrade. Keeping the configuration within the standard software makes future updates easier to manage without rebuilding custom functionality.
Improve warehouse labor performance with Open Sky Group
An LMS can only give you a reliable measure of productivity when its labor standards reflect the work associates perform. That starts with configuring the system around your warehouse’s processes and continues as layouts, equipment, and working methods change.
Open Sky Group supports both. Our consultants implement Blue Yonder Warehouse Labor Management and configure labor standards, from simple expected rates to multi-variable engineered standards. We follow a no-modification approach, using the software’s existing configuration rather than changing its base code, which reduces rework during future upgrades.
After go-live, our industrial engineers provide ongoing standards reviews and recalibration through Engineering Services. This keeps performance measurements aligned with changes on the warehouse floor, without leaving your supervisors to manage outdated targets. Whether you’re considering activating a labor module or improving an existing LMS, talk to an expert about where to start.